مراقب حالة المواقع
TestingMediumتطبيق ويب عربي بسيط وحديث باسم "مراقب حالة المواقع"
5/5 tasks completed (auto-calculated).
Tags
None
Blockers
None
Project execution
Agent: Claude Code
Started: 9/12/2026, 11:36:47 PM · Completed: 9/12/2026, 11:59:03 PM
Project execution completed
5 of 5 tasks completed automatically
Final delivery
- Build: PASSED — static project — artifacts copied (requirement verification below)
- Tests: PASSED — requirement verification: 10/10 required signals verified
- Project repository: /app/storage/projects/cmtyf2rsm0001n5d1dyzrjw9q/repo
- Build artifact: /app/storage/projects/cmtyf2rsm0001n5d1dyzrjw9q/build
- Type: static · Delivered: 9/12/2026, 11:59:03 PM
Results / artifacts
Publish to Internet
- Site name: مراقب حالة المواقع
- Subdomain: site-4.smvapp.cloud
- Deployment type: static
- HTTPS: Automatic certificate (Let's Encrypt)
- Health: healthy
- Last deployed: 9/12/2026, 1:45:27 PM
Editing or re-running the project never changes the published site — only “Redeploy” updates it.
Automations
Registered n8n automations for this project. Running one triggers the n8n workflow; its callback settles the run.
- Site status check (managed)ActiveWebhook path: /pos-site-check-project-6 · n8n #iy4HxJVJfaHZXfqO · Last run: 9/13/2026, 4:07:06 PM
Recent runs
- SucceededSite status check (managed)9/13/2026, 4:07:06 PM
- SucceededSite status check (managed)9/13/2026, 3:03:23 AM
- SucceededSite status check (managed)9/13/2026, 2:53:22 AM
- SucceededSite status check (managed)9/13/2026, 12:18:10 AM
- SucceededSite status check (managed)9/12/2026, 11:58:48 PM
- SucceededSite status check (managed)9/12/2026, 11:57:23 PM
- SucceededSite status check (managed)9/12/2026, 11:52:56 PM
Roadmap
Ordered phases and their tasks. Progress is calculated from tasks.
- #1
تصميم وتطوير الواجهة
Completedبناء صفحة الويب الأساسية باللغة العربية واتجاه RTL مع عرض البطاقات وزر الفحص.
1 task · 1 done100%Tasks (1)
+ Add task- بناء هيكل واجهة المستخدمHigh
إنشاء صفحة HTML/CSS عربية (RTL) متجاوبة تحتوي على العنوان، الوصف، زر 'فحص المواقع الآن'، وثلاث بطاقات للمواقع تعرض اسم الموقع، الحالة، HTTP Status، ووقت آخر فحص.
- #2
تكامل n8n وبناء الأتمتة
Completedإعداد سير العمل في n8n لإجراء الفحص الفعلي للمواقع وإرجاع النتائج.
1 task · 1 done100%Tasks (1)
+ Add task- إنشاء Workflow فحص المواقع في n8nCritical
بناء أتمتة في n8n تستقبل طلب التشغيل، تقوم بإرسال HTTP Request حقيقي للمواقع الثلاثة، وتقوم بإرجاع النتائج (الحالة، HTTP Status، وقت الفحص) إلى Project OS عبر نظام Callback.
- #3
ربط الواجهة بالأتمتة
Completedتفعيل زر الفحص لتشغيل الأتمتة واستقبال البيانات الحقيقية.
1 task · 1 done100%Tasks (1)
+ Add task- برمجة زر الفحص وتشغيل الأتمتةCritical
كتابة كود JavaScript لربط زر 'فحص المواقع الآن' لإرسال طلب تشغيل الأتمتة إلى n8n، وانتظار استلام النتائج عبر نظام Callback الخاص بـ Project OS.
- #4
عرض النتائج والتحقق
CompletedCurrentتحديث الواجهة بالبيانات الحقيقية والتحقق من تكامل المشروع بالكامل.
2 tasks · 2 done100%Tasks (2)
+ Add task- تحديث البطاقات بالنتائج الحقيقيةHigh
برمجة الواجهة لاستقبال البيانات المرجعة من n8n وتحديث بطاقات المواقع الثلاثة بالحالة (يعمل/متوقف)، HTTP Status، ووقت آخر فحص دون استخدام أي بيانات وهمية.
- التحقق الشامل من التكاملMedium
اختبار أن الواجهة تعمل بـ RTL، الزر يشغل n8n بنجاح، تتم عملية الفحص الفعلي للمواقع الثلاثة، وتظهر النتائج الحقيقية في البطاقات.
Notes
0 notes · Markdown supported
No notes yet.
Decisions
0 decisions · explicit log
No decisions yet.
Activity
65 events · most recent first
- Project execution completedProject execution completed — delivered (final build passed; requirement verification passed).Sep 12, 2026, 11:59 PM
- project.run.buildingFinal build/validation started (all roadmap tasks integrated).Sep 12, 2026, 11:59 PM
- Project task completedTask verified by project execution (verification-only, no file changes required).Sep 12, 2026, 11:59 PM
- project.run.task.noopVerified (no file changes required) for task التحقق الشامل من التكامل: verified (verification-only task, no file changes required) — evidence: deterministic page check passedSep 12, 2026, 11:59 PM
- Autonomous execution startedAutonomous execution started: التحقق الشامل من التكاملSep 12, 2026, 11:56 PM
- Project task completedTask completed and integrated by project execution.Sep 12, 2026, 11:56 PM
- Project task completedIntegrated run for task تحديث البطاقات بالنتائج الحقيقيةSep 12, 2026, 11:56 PM
- Autonomous execution startedAutonomous execution started: تحديث البطاقات بالنتائج الحقيقيةSep 12, 2026, 11:52 PM
- Project task completedTask completed and integrated by project execution.Sep 12, 2026, 11:52 PM
- Project task completedIntegrated run for task برمجة زر الفحص وتشغيل الأتمتةSep 12, 2026, 11:52 PM
- Autonomous execution startedAutonomous execution started: برمجة زر الفحص وتشغيل الأتمتةSep 12, 2026, 11:46 PM
- Autonomous execution startedAutonomous execution started: برمجة زر الفحص وتشغيل الأتمتةSep 12, 2026, 11:38 PM
- Project task completedTask completed and integrated by project execution.Sep 12, 2026, 11:38 PM
- Project task completedIntegrated run for task إنشاء Workflow فحص المواقع في n8nSep 12, 2026, 11:38 PM
- Autonomous execution startedAutonomous execution started: إنشاء Workflow فحص المواقع في n8nSep 12, 2026, 11:37 PM
- Project task completedTask completed and integrated by project execution.Sep 12, 2026, 11:37 PM
- Project task completedIntegrated run for task بناء هيكل واجهة المستخدمSep 12, 2026, 11:37 PM
- Autonomous execution startedAutonomous execution started: بناء هيكل واجهة المستخدمSep 12, 2026, 11:36 PM
- Project execution startedProject execution started (one-click authorized).Sep 12, 2026, 11:36 PM
- project.run.restartedProject tasks reopened for a fresh run (restart authorized).Sep 12, 2026, 11:36 PM
- Project execution completedProject execution completed — delivered, but requirement verification FAILED (requested functionality may be missing). Review the delivery before publishing.Sep 12, 2026, 11:01 PM
- project.run.buildingFinal build/validation started (all roadmap tasks integrated).Sep 12, 2026, 11:01 PM
- Project task completedTask verified by project execution (verification-only, no file changes required).Sep 12, 2026, 11:01 PM
- project.run.task.noopVerified (no file changes required) for task التحقق الشامل من التكامل: verified (verification-only task, no file changes required) — evidence: deterministic page check passedSep 12, 2026, 11:01 PM
- Autonomous execution startedAutonomous execution started: التحقق الشامل من التكاملSep 12, 2026, 11:00 PM
- Project execution resumedProject execution resumed.Sep 12, 2026, 11:00 PM
- Project execution failureTask failed — execution parked. Fix the cause and Resume (completed work preserved).Sep 12, 2026, 09:11 PM
- Autonomous execution startedAutonomous execution started: التحقق الشامل من التكاملSep 12, 2026, 09:11 PM
- Autonomous execution startedAutonomous execution started: التحقق الشامل من التكاملSep 12, 2026, 09:11 PM
- Project task completedTask completed without file changes (verified no-op) by project execution.Sep 12, 2026, 09:11 PM
Files
0 files · stored on the filesystem
No files yet.
AI
Use the AI Planner to generate a structured plan from an idea.
Open AI Planner